Apr 22: Preparing backing and top to load. Seams in the backing should be pressed open and all seams on the back of the top should lay flat. I like to use an iron to touch up any extra creases or folds that cannot be helped when shipped. IQ is programmed with a 7.5" high pattern. (Becky, let me know if you think the dragon files pattern needs to larger/looser.)
Apr 23: Finished loading & basting. Ready to quilt. And quilted! Posting a lot of finished pictures because they came out so well. That doesn't usually happen. Must be a magic quilt.
Apr 24: Binding is now attached. Hand binding is underway.
Apr 26: Binding is finished.

